IRP-2 Sub-Station 1Nos New Server Rack Installation Done






IRP-2 Sub-Station 1Nos New Server Rack Installation Done
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
There was a damaged LIT. After regeneration work we have install a new LIT
The Rehabilitation work is on going as long as 6 month. Any scenario of development of this DTW isn’t shown.After visiting this DTW,…
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.