IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.




IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.




 
			Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
 
			IRP-2 Server Rack Installation and Optical Fiber Rejoin Done