IRP-1 All LOP Panel Cleaning Done
IRP-1 Sand Filter FCP Panel Cleaning Done
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
Observation: Radio communication checking complete DTW 221.1. In DTW 221, We checked up to 10 minutes. RSSI Value (Dc volts) MAX: 2.700V, MIN:…
Problem: 01 nos CC Camera Do not show footage in NAV.Problem found: Automatic IP has been changed in the dome Camera. Than IP…