DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done
DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done
DTW-113 Scada Pack Programing And Install Done
DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…
Findings: SFP problem found in 1 Nos S-Ring switch. As a result, 172.16.100.110,111,113,115 I/P assigned camera’s view isn’t shown in SCADA monitor. Action…
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
Optical Fiber Network Status October 2022 SL NO. Location In Between DTW Near Pole No Lat/Long Affected Location Remarks 01 Baherchor to Bottoli…