Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.
DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…
Float switch reconnection and rearrange. Now normal
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity