Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
Breaker installation for SCADA control Room Monitor Done
Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে HiHiLoLo সিগনাল…
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity