- DTW-113 LIT,PIT,FIT isolation due to regenerationPosted on- Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply… 
- ACTIVITY | DAILY REPORTS | MOV | Parvez | UncategorizedWID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.Posted onFinding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07. 
  - CCTV Maintenance At DTW-206Posted on- 1.Cable connector change 2. IP Setup 
- DTW-223 5Nos CCTV MaintenancePosted on- ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4 
 ACTIVITY | DAILY REPORTS | DTW ACTIVITY | DAILY REPORTS | DTW- DTW-113 Scada Pack InstallPosted on- DTW-113 Scada Pack Programing And Install Done 
  - EPRV work with DTW 103 by ICE Team & SELPosted on