OPTICAL FIBER MAINTENANCE AT DTW-104
Posted on
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…

ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez
IRP-2 Sub-Station CC Camera Maintenance
Posted on
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
CCTV Footage Analysis Data
Posted on
DTW107 Missing Footage Time SL No Date Tme /= Duration Reason 1 2022.08.20 12 AM – 8.05 AM = 8 Hours 5 Minute…
Report: IRP-2 Dome Camera and Panel preventive maintenance.
Posted on
Equipment Status Dome Camera: All Ok Power Supply: Ok Ring Switch: Ok Findings: After raining water found in panel. Suggestion: Solution for water…

DTW- 221 VFD And LIT Installation
Posted on
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter

ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue
DTW-117 & 118 UVR Related M/C checking.
Posted on
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…