Similar Posts
IRP-1/2 Optical Fiber Maintenance Report
Posted on
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
MONTHLY REPORT 2022
Posted on
Instrumentation Findings of Month (July,2022)
Posted on
SL/NO PROBLEMS TAG LOCATION REMARK 1 When the pump runs, the pump Motor + MOV runs together. Which does not follow the normal…
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS
IRP-1 CC Camera Server Panel Cleaning
Posted on
IRP-1. CC Camera Server Panel Cleaning Done
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez
DTW-110 Pump inspection & ready to run up.
Posted on
Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…
DTW115 SCADA PACK INSTALL COMPLETE
Posted on