Equipment Status
Dome Camera: All Ok
Power Supply: Ok
Ring Switch: Ok
Findings: After raining water found in panel.
Suggestion: Solution for water presence.
Equipment Status
Dome Camera: All Ok
Power Supply: Ok
Ring Switch: Ok
Findings: After raining water found in panel.
Suggestion: Solution for water presence.
Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
ScadaPack transfer from DTW-207 to 202 Done
DTW-106 CCTV Base Placement Done
Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26