Device Status
OLT : OK
UPS: OK
ONU: Ok
POE Switch : OK
Findings: Too much dust inside all device.
Suggestion: New separate panel Installation for OLT device.
Device Status
OLT : OK
UPS: OK
ONU: Ok
POE Switch : OK
Findings: Too much dust inside all device.
Suggestion: New separate panel Installation for OLT device.
Float switch reconnection and rearrange. Now normal
NEV voltage [Report] SL No. Location Voltage Comments 01. DTW-101 37mV 02. DTW-102 170mV 03. DTW-103 231mV 04. DTW-104 1.1V 05. DTW-105 42mV…
Dtw-208 CCTV power supply is received from directly LV panel. Frequently Fault come in UPS. Now Everything is Normal.
SCADA Room & Work Station CPU cleaning