IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
Posted on
Previous control cable is damaged by ant .so we replace new control cable
IRP-1 All DTW NEV Voltage check
Posted on

ACTIVITY | DAILY REPORTS | Parvez | REPORTS
OGR Booster room dewatering pump run command showing problem at low level
Posted on
Float switch reconnection and rearrange. Now normal

ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS
IRP-1 CC Camera Server Panel Cleaning
Posted on
IRP-1. CC Camera Server Panel Cleaning Done