In DTW-109, there are 4 Nos maintenance and installation :
- 1 Nos new PoE switch install.
- 2. 3 Nos new camera install.
- 3. 35 meter new UTP cable install.
- 4. 10 Nos RJ-45 connector change in pole side & switch side.
Note : Need to enlist in NAV-1 to cctv view.
One Comment