Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )
Posted onSL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…
DTW223 RTU INSPECTION JOINTLY WITH GKB ENGINEERING LTD
Posted onDTW223 is constructed
- DAILY REPORTS | DTW | Parvez | REPORTS | Uncategorized
WID562:DTW217 flow value is not shown in SCADA
Posted onFindings: The cable was disconnected. Action taken: Dressing the cable and reconnect.