On/Off switch problem found. Need to change the switch.



On/Off switch replace done. Now ELD operational.
On/Off switch problem found. Need to change the switch.
On/Off switch replace done. Now ELD operational.
Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
Checking Step SL Checking Stage Remarks MOV physical status (Wiring, OK 1 MOV to RTU Panel Terminal MOV ok. 2 SCADAPACK Analog output…