Similar Posts
MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted onSL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
বিদ্যমান টিজে বক্স
Posted onIRP-1 DTW (101 to123) VFD & VFD CONTROLLER REPORT.
Posted onDTW VFD VFD CONTROLLER COMMENTS 101 OK OK 102 OK OK 103 OK NOT OK 104 OK OK 105 OK OK 106 OK…
Fiber Optical Maintenance
Posted onFiber Optical Maintenance Near DTW-103
WID558: DTW123 ELD installation and Leakage current check.
Posted onFindings : ELD fuse burns when main UPS take input power. Action taken: 1. UPS replace but problem isn’t solved. 2. ELD replace…
LIGHT STAR PANEL POWER METER
Posted onBrand Name: Light Star Product Name: Panel Power Meter Model No/Part No: KDX-AC Country of Origin: Korea Country of Shipment: As per country…