There was so much dust
Similar Posts
MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted on
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
DTW114 Local Pipeline MOV-1 automatic close when MOV-1 turn in Remote mode
Posted on
Checking Step SL Checking Stage Remarks MOV physical status (Wiring, OK 1 MOV to RTU Panel Terminal MOV ok. 2 SCADAPACK Analog output…
Surge Protection Device
Posted on
Surge Protection Device: (TIS.24S) >Designed and manufactured to apply to LPZ (Lightning Protection Zone) 2 > Satisfies KS C IEC 61643-21, ANSI/IEEE C62.41…
WID645: DTW-215 need install a new bullet camera.
Posted on
Findings: A bullet camera internal damaged found.