DTW NO. | CCTV | LV | PWP | RTU | GCP |
---|---|---|---|---|---|
101 | |||||
102 | |||||
103 | |||||
104 | |||||
105 | |||||
106 | |||||
107 | |||||
109 | |||||
110 | |||||
111 | |||||
112 | |||||
113 | |||||
114 | |||||
115 | |||||
117 | |||||
118 | |||||
119 | |||||
120 | |||||
121 | |||||
122 | |||||
123 | |||||
201 | |||||
202 | |||||
203 | |||||
205 | |||||
206 | |||||
207 | |||||
208 | |||||
209 | |||||
210 | |||||
211 | |||||
212 | |||||
213 | |||||
216 | |||||
217 | |||||
219 | |||||
220 | |||||
221 | |||||
222 | |||||
223 | |||||
Similar Posts
Preventive work schedule Nov-2023 (Kazi Jewel)
Posted on
SL. No. Date WID: TaskDescription Location Manpower Remarks 01 1 November WID1: DTW-207 Optical Fiber maintenance. DTW-206 & 207 Kazi Jewel-HRasel Mizi-HGias Uddin-H…
WID645: DTW-215 need install a new bullet camera.
Posted on
Findings: A bullet camera internal damaged found.
PWTP PLC Cabinet
Posted on
SL. No Name/Brand Model Location Type Remarks 01 Mid-range PAC industrial process and infrastructure control “All-in-one CPU”7 Kinst/msMultitasking system for guaranteed reflex timeUSB…
WID627: IRP#1 SDB Pump ‘A’ sensor is not working. Need to check.
Posted on
স্লাজ ড্রায়িং বেডের পানি, পাম্প চেম্বারের লেভেল পূর্ণ করতে সময় বেশি নেয়।
Demand List for the SCADA
Posted on
উপরোক্ত বিষয়ের প্রেক্ষিতে জানানো যাচ্ছে যে, আইসি টিম সাভার কেরানীগঞ্জ ওয়েল ফিল্ড প্ল্যান্ট এর স্ক্যাডা ও instrumentation এর সাথে সংশ্লিষ্ট কার্যক্রমসমূহ(LIT, PIT, VFD….