  - IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Posted on- RTU Panel cleaning completed. 
- MONTHLY REPORT 2022Posted on
  - Absolute Data Logger – Suspended ModelPosted on- This specific model is suspended , the manufacturer should not continue these item https://heroninstruments.com/products/groundwater-data-loggers/absolute-data-logger-models/absolute-data-logger-suspended-model/ 
- WID632: Dtw-106 ELD problem check.Posted on- On/Off switch problem found. Need to change the switch. On/Off switch replace done. Now ELD operational. 
  - UVR & ELD monthly cleaningPosted on- In all DTW, there have lot of essential electronic devices that protect & control our system. UVR & ELD are playing a important… 