





DTW-116 communication fully error Location: IRP1 Problem Start Date: 6/4/2023 Identified By: Ruhul Amin Solve at: Total Time Required: Total Manpower Deployed: Lead…
Task List
Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.
SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…
Introduction Supervisory Control and Data Acquisition (SCADA) serves as the backbone for digitalizing water management systems, playing a crucial role in achieving the…