Uncategorized Monthly Work Plan ( Jun-July )for Pappu Dhar Posted onJune 26, 2022August 21, 2022 Work List (Preventive Maintenance)
Uncategorized WID590: IRP-1 OGR utility pump problem check.IRP-1 OGR utility pump problem check. Posted onNovember 28, 2023December 11, 2023 Findings: Switch problem found. Action taken: Switch replace.
Uncategorized IRP#02 Backwash Holding Tank “B” Pump Not Changing Manual To Auto From Scada system. Posted onSeptember 10, 2022September 10, 2022
Uncategorized WID558: DTW-123 ELD problem solved. A repaired ELD installation done. Posted onNovember 25, 2023November 25, 2023
Impressive, but follow the vendor instructions.