Fiber Join and cable arrangement
Now DTW-115,117,118,119 CCTV Operation in NAV-2






Fiber Join and cable arrangement
Now DTW-115,117,118,119 CCTV Operation in NAV-2
This specific model is suspended , the manufacturer should not continue these item https://heroninstruments.com/products/groundwater-data-loggers/absolute-data-logger-models/absolute-data-logger-suspended-model/
DTW-116 communication fully error Location: IRP1 Problem Start Date: 6/4/2023 Identified By: Ruhul Amin Solve at: Total Time Required: Total Manpower Deployed: Lead…
যে সমস্ত DTW তে সিভিল কাজের জন্য পাম্প হাউজের ভিতরে সিমেন্ট বা অন্যান্য মালামাল রাখা হয় , সেই সমস্ত DTW এর ডিভাইসে সবচেয়ে…
Findings: The cable was disconnected. Action taken: Dressing the cable and reconnect.
MD. PARVAS AUTOMATION TECHNICIAN Monthly Preventive Maintenance Task
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…