DTW Regeneration/Rehabilitation Record 2022
Posted on
SL NO DTW NO START DATE END DATE REMARKS 1 DTW-104 NO DATA 2 DTW-105 08.09.2022 STILL NOW 3 DTW-106 19.08.2022 05.09.2022 4…
WID590: IRP-1 OGR utility pump problem check.
Posted on
Findings: Flote Switch mis-displacement problem found. Need to dressing the cable with cable tie.

IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.
Posted on
Cleaning Completed.
Preventive work schedule Nov-2023 (Kazi Jewel)
Posted on
SL. No. Date WID: TaskDescription Location Manpower Remarks 01 1 November WID1: DTW-207 Optical Fiber maintenance. DTW-206 & 207 Kazi Jewel-HRasel Mizi-HGias Uddin-H…
WID:552 IRP2 Sandfilter MOV-3V05 fault showing problem check.
Posted on
Findings: The relay always stay energize getting power from Digital Output I/O card. So sandfilter can’t maintain the backwash sequence. That’s why ,…