Findings: The relay always stay energize getting power from Digital Output I/O card. So sandfilter can’t maintain the backwash sequence. That’s why , we change the DDO module in FCP-1 panel. Now the SF is working normally.

Findings: The relay always stay energize getting power from Digital Output I/O card. So sandfilter can’t maintain the backwash sequence. That’s why , we change the DDO module in FCP-1 panel. Now the SF is working normally.
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…