Action Taken: 1. Check SPD. 2. Check Antenna cable. 3. Checking the RSSI value changing the direction of Antenna.
Result: After doing the work , We can’t develop the signal strength. ( A lot of Trees is stood in front of Antenna)

Action Taken: 1. Check SPD. 2. Check Antenna cable. 3. Checking the RSSI value changing the direction of Antenna.
Result: After doing the work , We can’t develop the signal strength. ( A lot of Trees is stood in front of Antenna)

SL No. 02 December PWID112: DTW-101 RTU,VFD,CCTV panel equipments internal clean. DTW-101 Parvas-AT Kazi Jewel-H Gias Uddin-H 01 02 December PWID113: DTW-102…
SL NO DTW NO START DATE END DATE REMARKS 1 DTW-104 NO DATA 2 DTW-105 08.09.2022 STILL NOW 3 DTW-106 19.08.2022 05.09.2022 4…
 
			Preventive Work Scope SL. NO Work Name Interval Comments Estimated Date 1 SANDFILTER BED ALL LIT SENSOR CLEANING. 2 VFD…
 
			Work List (Preventive Maintenance)
 
			যে সমস্ত DTW তে সিভিল কাজের জন্য পাম্প হাউজের ভিতরে সিমেন্ট বা অন্যান্য মালামাল রাখা হয় , সেই সমস্ত DTW এর ডিভাইসে সবচেয়ে…
Introduction Supervisory Control and Data Acquisition (SCADA) serves as the backbone for digitalizing water management systems, playing a crucial role in achieving the…