Findings: Flote Switch mis-displacement problem found.
Need to dressing the cable with cable tie.




Findings: Flote Switch mis-displacement problem found.
Need to dressing the cable with cable tie.
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
IRP-2 All ultrasonic type level sensor clean task complete.
Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
PLC SL NO ITEM NAME BRAND NAME MODEL DC Power Supply ACRO AD1048-24FS Industrial S-ring Switch Sol Tech SFC8000 Fiber Optic Terminantion Box…