Findings: FIT-4002 Ultrasonic sensor Schedule maintenance time over .,
Action taken: Plug out both Upstream & Downstream sensor. Clean the sensor & cable connector. Reinstall the sensor.


Findings: FIT-4002 Ultrasonic sensor Schedule maintenance time over .,
Action taken: Plug out both Upstream & Downstream sensor. Clean the sensor & cable connector. Reinstall the sensor.
There was so much dust
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…