Uncategorized WID622: DTW-107 LIT, PIT, FIT and others instruments re installation. Posted onJanuary 4, 2024January 4, 2024
Uncategorized DTW 116,117,118,119,120,121,122,123 RTU, LIT, PIT, FIT check and maintenance. Posted onNovember 8, 2023November 8, 2023 PWID: 74, 75, 76, 77, 78, 79, 80, 81 It’s just a preventive work to avoid upcoming problems of Field Devices & Instruments.
Uncategorized Proposed TJ box and Fiber optic cable mounting clamp for securing and smoothly operate fiber optic transmission network. Posted onMay 16, 2022 Clamp
ACTIVITY | CCTV | DTW | Jewel | Parvez | Uncategorized CCTV maintenance at DTW-109 Posted onOctober 6, 2022October 6, 2022 In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….