1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
DTW-104,105,106,107 Cleaning Done