1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
DTW NO. LIT PIT Comments DTW NO. LIT PIT Comments 101 NOT OK OK 201 OK OK 102 OK OK 202 NOT OK…
Breaker installation for SCADA control Room Monitor Done
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
1.one new camera installation 2. Connector Change 3.IP Setup