Md. Faysal Zaman – Monthly Task Plan( 26 June – 26 July)
Posted onTask List
CCTV maintenance Report – January 2024
Posted onSL. No. DTW No./Camera Problem Findings Maintenance Remarks 01 201/1 Cable damage. UTP cable core interchange. 5 Nos cameras are operational. 02 205/1…
IRP-2 SCADA Room RTU and Server Panel Preventive Maintenance.
Posted onAll panel cleaning completed.
WID602: Dtw-103 VFD fault. It happened also the previous 5 times. Need to properly check ups and others all panel.
Posted onFindings: Serial comm. cable lose connection found & generator has Digital Input fault problem that’s why modbus interrupt comes frequently. Action taken: Plugout…
PWTP Micro SCADA
Posted onSL. No Name/Brand Model Location Type Remarks 01 CONSERVER WXD216NCR PWTP/IPS/BPS Micro SCADA 02 Ethernet Switch H3C S1016/1024 PWTP/IPS/BPS Switch 03 04 05…
WID661: Monitoring Well Data collect & sensor maintenance.
Posted on1 Nos logger drop down due to lack of supporting SS ‘O’ ring. Need to take proper steps to pull up the Logger…