Skip to content
TEAM ICE

TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
TEAM ICE
  • Uncategorized

    Optical Fiber Maintenance For DTW-115 To 119

    Posted onDecember 17, 2022December 17, 2022

    Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2

    Listen to the Message Optical Fiber Maintenance For DTW-115 To 119Continue

  • Uncategorized

    DTW-102 Radio Antena Setting

    Posted onDecember 17, 2022December 17, 2022

    DTW-102 Radio Antena Setting Done now radio signal normal and stable, DTW is remotely operatable

    Listen to the Message DTW-102 Radio Antena SettingContinue

  • Uncategorized

    DTW-202,211,213 VFD,RTU & CCTV Panel Cleaning

    Posted onDecember 13, 2022December 13, 2022

    There was so much dust

    Listen to the Message DTW-202,211,213 VFD,RTU & CCTV Panel CleaningContinue

  • Uncategorized

    Demand for Goods

    Posted onNovember 15, 2022November 28, 2022

    SL. No Item Name Unit Qty. Remarks 1 Magnetic Contactor Nos 3 2 Float Switch Nos 2 3 OGR Supply Fan Motor Nos…

    Listen to the Message Demand for GoodsContinue

  • Uncategorized

    Chlorine Weighing Scale Callibration

    Posted onNovember 15, 2022November 15, 2022

    Listen to the Message Chlorine Weighing Scale CallibrationContinue

  • Uncategorized

    Civil Construction Dust Create Massive Vulnerabilities

    Posted onNovember 13, 2022November 13, 2022

    যে সমস্ত DTW তে সিভিল কাজের জন্য পাম্প হাউজের ভিতরে সিমেন্ট বা অন্যান্য মালামাল রাখা হয় , সেই সমস্ত DTW এর ডিভাইসে সবচেয়ে…

    Listen to the Message Civil Construction Dust Create Massive VulnerabilitiesContinue

  • Uncategorized

    DTW Regeneration/Rehabilitation Record 2022

    Posted onNovember 13, 2022November 14, 2022

    SL NO DTW NO START DATE END DATE REMARKS 1 DTW-104 NO DATA 2 DTW-105 08.09.2022 STILL NOW 3 DTW-106 19.08.2022 05.09.2022 4…

    Listen to the Message DTW Regeneration/Rehabilitation Record 2022Continue

  • Uncategorized

    HP ZCentral 4R 1U Rack Workstation

    Posted onNovember 5, 2022December 11, 2022

    Parameters Specification Processor Intel Xeon W-2223 (3.6 GHz base frequency, 4 cores) up to 3.9 GHz with Intel® Turbo Boost Technology, 8.25 MB cache…

    Listen to the Message HP ZCentral 4R 1U Rack WorkstationContinue

  • Uncategorized

    MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)

    Posted onOctober 29, 2022October 29, 2022

    SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…

    Listen to the Message MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)Continue

  • ACTIVITY | CCTV | DTW | Uncategorized

    CCTV Maintenance At DTW-102

    Posted onOctober 23, 2022October 23, 2022

    1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang

    Listen to the Message CCTV Maintenance At DTW-102Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers