Preventive working schedule-Nov2023( Md. Parvas)
Posted onSL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…
WID650: DTW-115 LV panel control wiring short circuit check.
Posted onLV panel control power short ckt problem found from UVR.
Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )
Posted onSL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…