  • ACTIVITY | DAILY REPORTS | DTW | REPORTS

    DTW-122 Grass plantation

    Posted onDecember 22, 2022December 22, 2022

    There is so much dust  so we Plant grass to prevent road side dust

    Listen to the Message DTW-122 Grass plantationContinue

  • ACTIVITY | DAILY REPORTS | REPORTS

    IRP-2 All Dome Camera Lens Cleaning

    Posted onDecember 21, 2022December 21, 2022

    IRP-2 All Dome Camera Lens Cleaning Done

    Listen to the Message IRP-2 All Dome Camera Lens CleaningContinue

  • ACTIVITY | DAILY REPORTS | REPORTS

    SCADA Room & Work Station CPU cleaning

    Posted onDecember 21, 2022December 21, 2022

    SCADA Room & Work Station CPU cleaning

    Listen to the Message SCADA Room & Work Station CPU cleaningContinue

  • REPORTS

    DTW215 Construction Status

    Posted onDecember 20, 2022December 20, 2022

    Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26

    Listen to the Message DTW215 Construction StatusContinue

  • Dual Power Source for Optical Fiber Network at SKWP
    Projects

    Dual Power Source for Optical Fiber Network at SKWP

    Posted onDecember 18, 2022July 9, 2026

    What is Dual Power Source Dual power source means double power source to operate any electrical system. Necessity of Dual Power Source at…

    Listen to the Message Dual Power Source for Optical Fiber Network at SKWPContinue

  • Uncategorized

    Optical Fiber recheck for DTW-122 To 123

    Posted onDecember 17, 2022

    Still Fiber Loss

    Listen to the Message Optical Fiber recheck for DTW-122 To 123Continue

  • Uncategorized

    Optical Fiber Maintenance For DTW-115 To 119

    Posted onDecember 17, 2022December 17, 2022

    Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2

    Listen to the Message Optical Fiber Maintenance For DTW-115 To 119Continue

  • Uncategorized

    DTW-102 Radio Antena Setting

    Posted onDecember 17, 2022December 17, 2022

    DTW-102 Radio Antena Setting Done now radio signal normal and stable, DTW is remotely operatable

    Listen to the Message DTW-102 Radio Antena SettingContinue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

    DTW-Camera Lens Cleaning

    Posted onDecember 14, 2022December 18, 2022

    DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.

    Listen to the Message DTW-Camera Lens CleaningContinue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

    DTW-120 CCTV Maintenance

    Posted onDecember 13, 2022December 13, 2022

    DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2

    Listen to the Message DTW-120 CCTV MaintenanceContinue

Page navigation

Previous PagePrevious 1 … 17 18 19 20 21 … 61 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers