Checking and maintenance of 2 field pumps completed.





Checking and maintenance of 2 field pumps completed.





VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity
Specification SL No Specification criteria Specifications 1 Length of Tube 60mm 2 Inner Tube Diameter Inner 1.5mmOuter 2.2mm 3 After Recover Diameter 3mm…