Checking and maintenance of 2 field pumps completed.
Similar Posts
DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETE
Posted on
106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
IRP-1 CCTV monitor HDMI cable plug & power up
Posted on
IRP-1 CCTV monitor HDMI cable plug & power up Done
ACTIVITY | DAILY REPORTS | DTW | Pappu | Pending Issue
UVR checking complete at DTW 216
Posted on
Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 216 UVR checked, when plug PTT UVR…
Optical Fiber Maintenance
Posted on
Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
DTW-223 5Nos CCTV Maintenance
Posted on
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4