Device Status
OLT : OK
UPS: OK
ONU: Ok
POE Switch : OK
Findings: Too much dust inside all device.
Suggestion: New separate panel Installation for OLT device.
Device Status
OLT : OK
UPS: OK
ONU: Ok
POE Switch : OK
Findings: Too much dust inside all device.
Suggestion: New separate panel Installation for OLT device.
Savar-Keraniganj Well Field Plant IRP-1 & 2 all DTW’s CCTV UPS maintenance , replace & install SL No. DTW No. Problem Activity Comment…
Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
ScadaPack transfer from DTW-207 to 202 Done
1.Cable connector change 2. IP Setup
There is so much dust so we Plant grass to prevent road side dust
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…