DTW-102 Scada Pack Programing And Install Done




DTW-102 Scada Pack Programing And Install Done




Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,
Float switch reconnection and rearrange. Now normal
IRP-1. CC Camera Server Panel Cleaning Done
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
There was so much dust
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…