ACTIVITY PROSOSED SYSTEM FOR CONTRACTOR WORK ENVIRONMENT Posted onSeptember 14, 2022September 14, 2022
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez 4 nos Monitoring Well Level Sensor Installation Complete. Posted onSeptember 21, 2022September 21, 2022 1 :MW03B 2: MW14A 3:MW08A 4: MW13B
ACTIVITY PWID25:DTW202 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pappu | Pending Issue DTW- 201 Radio Communication checking complete. Posted onOctober 6, 2022October 12, 2022 Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS IRP-1 CC Camera Server Panel Cleaning Posted onNovember 16, 2022November 16, 2022 IRP-1. CC Camera Server Panel Cleaning Done