ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS DTW-111,113,114,115,117,118,119,120,121,122,123 I & C device checking complete. Posted onOctober 18, 2022October 18, 2022
ACTIVITY | Parvez PWID106: IRP-1 All FCP & LOP panel clean. Posted onNovember 21, 2023November 21, 2023
ACTIVITY | CCTV CCTV Maintenance At DTW-107 Posted onOctober 17, 2022December 11, 2022 1. connector change 2. IP Setup
ACTIVITY | CCTV | DTW CCTV Maintenance At DTW-120 Posted onOctober 27, 2022October 27, 2022 Connector change IP Setting
ACTIVITY | DAILY REPORTS | Parvez | REPORTS IRP-1 All sandfilter ultrasonic sensor cleaning Posted onNovember 29, 2022November 29, 2022 IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust
ACTIVITY | DTW | Jewel | Pappu LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK. Posted onOctober 29, 2022October 29, 2022