Similar Posts
1 x 2 PLC Fiber Splitter, Steel Tube, Bare Fiber 250μm, No Connector
Posted on
PLC-102-MM-90-SCA-15 Specification SL No Specification criteria Specifications 1 Package Style Mini Module 2 Configuration Type 1x 2 3 Fiber Grade G.657A1 4 Connector…
ACTIVITY | DAILY REPORTS | Parvez | REPORTS
Breaker installation for SCADA control Room Monitor.
Posted on
Breaker installation for SCADA control Room Monitor Done
ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez
IRP-2 Sub-Station CC Camera Maintenance
Posted on
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
ACTIVITY | DAILY REPORTS | Pappu | Parvez
IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance
Posted on
Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…