Similar Posts
Optical Fiber restoration work at DTW103
Posted on
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Instrumentation Findings of Month (October,2022)
Posted on
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
DTW-103 VFD Controller Install
Posted on
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done