IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
DTW-117
Checking and maintenance of 2 field pumps completed.
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
1.Cable connector change 2. IP Setup