Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
Problem: Do not show footage in NAV.Problem found: ONU & 1 Nos cc camera Problem found.
Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…
IRP-1 All LOP Panel Cleaning Done
Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….