MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
DTW NO. LIT PIT Comments DTW NO. LIT PIT Comments 101 NOT OK OK 201 OK OK 102 OK OK 202 NOT OK…
Connector change IP Setting
1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
Optical Fiber Network Status October 2022 SL NO. Location In Between DTW Near Pole No Lat/Long Affected Location Remarks 01 Baherchor to Bottoli…
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…