DTW-115 LIT Installing
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
1.UTP Cable Change 2.Connector Change 3.IP Setup
Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,
1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
1.Cable connector change 2. IP Setup
1.Cable connector change 2. IP Setup
1.Cable connector change 2. IP Setup
1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup