Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Problem found: POE Switch & 4 NOS CC camera problem found.
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…
SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…