    WID590: IRP-1 OGR utility pump problem check.

    Posted onNovember 28, 2023November 28, 2023

    Findings: Flote Switch mis-displacement problem found. Need to dressing the cable with cable tie.

    Listen to the Message WID590: IRP-1 OGR utility pump problem check.Continue

  • Uncategorized

    WID586: DTW-104 VFD fault & Modbus communication interruption. Need to check.

    Posted onNovember 26, 2023November 26, 2023

    Findings: 1. Signal Cable problem. 2. GiMAC Rx & Rt port problem found. Action Taken: 1. Cable check. 2. VFD controller port check…

    Listen to the Message WID586: DTW-104 VFD fault & Modbus communication interruption. Need to check.Continue

  • ACTIVITY | Uncategorized

    DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.Continue

  • ACTIVITY | DTW | Parvez | Uncategorized

    WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter works

    Posted onNovember 25, 2023November 26, 2023

    26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…

    Listen to the Message WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter worksContinue

  • Uncategorized

    WID558: DTW-123 ELD problem solved. A repaired ELD installation done.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message WID558: DTW-123 ELD problem solved. A repaired ELD installation done.Continue

  • ACTIVITY | DTW | Parvez | REPORTS

    DTW-113 LIT,PIT,FIT isolation due to regeneration

    Posted onNovember 23, 2023November 25, 2023

    Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…

    Listen to the Message DTW-113 LIT,PIT,FIT isolation due to regenerationContinue

  • CCTV | Parvez | REPORTS

    IRP-2 Sub-station optical fiber arrangement done.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message IRP-2 Sub-station optical fiber arrangement done.Continue

  • CCTV | DTW | Jewel | Parvez

    WID550: DTW-207 optical fiber maintenance.

    Posted onNovember 23, 2023November 23, 2023

    Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.

    Listen to the Message WID550: DTW-207 optical fiber maintenance.Continue

  • DAILY REPORTS | DTW | Parvez

    WID577: DTW-204 ACB can not close from SCADA.

    Posted onNovember 22, 2023December 11, 2023

    Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…

    Listen to the Message WID577: DTW-204 ACB can not close from SCADA.Continue

  • Uncategorized

    WID558: DTW123 ELD installation and Leakage current check.

    Posted onNovember 22, 2023November 22, 2023

    Findings : ELD fuse burns when main UPS take input power. Action taken: 1. UPS replace but problem isn’t solved. 2. ELD replace…

    Listen to the Message WID558: DTW123 ELD installation and Leakage current check.Continue

Page navigation

Previous PagePrevious 1 … 6 7 8 9 10 … 53 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers