Similar Posts
VCB Installation & Commissioning
Posted onInstallation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
- ACTIVITY | DTW | Parvez | Uncategorized
WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter works
Posted on26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | ParvezChlorine cylinder lode shell checking and maintenance.
Posted onProblem found: lode shell connection terminal circuit problem found.
DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETE
Posted on106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTSDTW-211 CCTV power is taken from main ups
Posted onDTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.
DTW- 208 Fault Come in CCTV UPS
Posted onDtw-208 CCTV power supply is received from directly LV panel. Frequently Fault come in UPS. Now Everything is Normal.