ACTIVITY | CCTV | DAILY REPORTS | DTW | ParvezIRP-2 Sub-Station CC Camera Maintenance
Posted onIRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Instrumentation of Month (September,2022)
Posted onDaily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
DTW-212 & 222 CCTV Maintenance
Posted onDTW-212 & 222 CCTV Maintenance Done Connector Change Now DTW-212 & 222 10 No’s CCTV Operation in NAV
IRP-1/2 Optical Fiber Maintenance Report
Posted onIRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
IRP-1 SDB Additional Dewatering Pump Fault check
Posted onIRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…