    PWID55,DTW114,115,116,117,118 119 RTU & CCTV Panel Clening

    Posted onNovember 29, 2023November 29, 2023

    Listen to the Message PWID55,DTW114,115,116,117,118 119 RTU & CCTV Panel CleningContinue

  • ACTIVITY

    PWID54,DTW107,109,110,111,112 111 RTU & CCTV Panel Clening

    Posted onNovember 28, 2023November 29, 2023

    Listen to the Message PWID54,DTW107,109,110,111,112 111 RTU & CCTV Panel CleningContinue

  • ACTIVITY

    PWID53,DTW101,102,103,104,105 106 RTU & CCTV Panel Clening

    Posted onNovember 27, 2023November 29, 2023

    Listen to the Message PWID53,DTW101,102,103,104,105 106 RTU & CCTV Panel CleningContinue

  • ACTIVITY | Uncategorized

    DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.Continue

  • ACTIVITY

    PWID51:DTW210 to 222 TJ Box sealing with silicon glue.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message PWID51:DTW210 to 222 TJ Box sealing with silicon glue.Continue

  • ACTIVITY | DTW | Parvez | Uncategorized

    WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter works

    Posted onNovember 25, 2023November 26, 2023

    26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…

    Listen to the Message WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter worksContinue

  • ACTIVITY | DTW | Parvez | REPORTS

    DTW-113 LIT,PIT,FIT isolation due to regeneration

    Posted onNovember 23, 2023November 25, 2023

    Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…

    Listen to the Message DTW-113 LIT,PIT,FIT isolation due to regenerationContinue

  • ACTIVITY | Parvez

    PWID106: IRP-1 All FCP & LOP panel clean.

    Posted onNovember 21, 2023November 21, 2023

    Listen to the Message PWID106: IRP-1 All FCP & LOP panel clean.Continue

  • ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized

    WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.

    Posted onNovember 21, 2023November 22, 2023

    Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.

    Listen to the Message WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.Continue

  • ACTIVITY

    PWID47:DTW104 to 111 TJ Box sealing with silicon glue.

    Posted onNovember 18, 2023November 18, 2023

    Listen to the Message PWID47:DTW104 to 111 TJ Box sealing with silicon glue.Continue

Page navigation

Previous PagePrevious 1 2 3 4 … 26 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers