DTW-113 LIT,PIT,FIT isolation due to regeneration
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.
Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
Findings: SFP problem found in 1 Nos S-Ring switch. As a result, 172.16.100.110,111,113,115 I/P assigned camera’s view isn’t shown in SCADA monitor. Action…
Findings: The cable was disconnected. Action taken: Dressing the cable and reconnect.
There is so much dust so we Plant grass to prevent road side dust
IRP-2 All Dome Camera Lens Cleaning Done
SCADA Room & Work Station CPU cleaning