IRP-2 Sand Filter All Ultrasonic Sensor Cleaning
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.
IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust
DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING COMPLETE
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.
Previous control cable is damaged by ant .so we replace new control cable