IRP-2 Sand Filter All Ultrasonic Sensor Cleaning
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

IRP-2 Sand Filter All Ultrasonic Sensor Cleaning

Posted onDecember 1, 2022December 1, 2022

IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.

Listen to the Message IRP-2 Sand Filter All Ultrasonic Sensor CleaningContinue

ACTIVITY | DAILY REPORTS | Parvez | REPORTS

IRP-1 All sandfilter ultrasonic sensor cleaning

Posted onNovember 29, 2022November 29, 2022

IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust

Listen to the Message IRP-1 All sandfilter ultrasonic sensor cleaningContinue

ACTIVITY | DAILY REPORTS | Parvez | REPORTS

IRP-1 All Doom Camera Lens & Camera Panel Cleaning

Posted onNovember 29, 2022November 29, 2022

IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust

Listen to the Message IRP-1 All Doom Camera Lens & Camera Panel CleaningContinue

DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING

Posted onNovember 27, 2022November 27, 2022

DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING COMPLETE

Listen to the Message DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANINGContinue

IRP-2 Sub-Station CC Camera Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez

IRP-2 Sub-Station CC Camera Maintenance

Posted onNovember 24, 2022November 24, 2022

IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.

Listen to the Message IRP-2 Sub-Station CC Camera MaintenanceContinue

DTW-122 & 123 Optical Fiber Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez

DTW-122 & 123 Optical Fiber Maintenance

Posted onNovember 24, 2022November 24, 2022

DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…

Listen to the Message DTW-122 & 123 Optical Fiber MaintenanceContinue

Optical Fiber Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez | REPORTS

Optical Fiber Maintenance

Posted onNovember 21, 2022November 22, 2022

Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…

Listen to the Message Optical Fiber MaintenanceContinue

ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

DTW-221 Modbus Serial communication Problem

Posted onNovember 20, 2022November 20, 2022

when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…

Listen to the Message DTW-221 Modbus Serial communication ProblemContinue

DTW-211 CCTV power is taken from main ups
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

DTW-211 CCTV power is taken from main ups

Posted onNovember 20, 2022November 20, 2022

DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.

Listen to the Message DTW-211 CCTV power is taken from main upsContinue

IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change

Posted onNovember 20, 2022November 20, 2022

Previous control cable is damaged by ant .so we replace new control cable

Listen to the Message IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable ChangeContinue

Page navigation

Previous PagePrevious 1 2 3 4 5 6 … 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers