Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…