Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
DTW-205 1Nos New PIT Installation Done DTW-211 1Nos New PIT Installation Done DTW-104 1Nos Old PIT Installation Done
There was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…