Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
There was a damaged LIT. After regeneration work we have install a new LIT
Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…
SPECIFICATION OF COOLING FAN (RTU PANEL) SL No Specification criteria Specifications 1 Brand Name: FULLTECH 2 Model Number UF12B23-H 3 Place of Origin:…
1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…