Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…
Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…