Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 203 UVR checked, When plug PTT UVR…
1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
DTW-113 Scada Pack Programing And Install Done