Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…
1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done